    The following photo set shows the progress of the rack rebuild that I performed yesterday.
    It starts with the old rack setup and then progresses through each level of the build:

    Original rack setup Just the Dell Poweredge server installed Added the tray for the secondary servers and web server. All trays installed including the LCD monitor. Final front shot of the rack install.

    It was good fun putting all the new equipment into the rack, but it is very time consuming
    especially when everything needs to be adjusted to fit. We had to pull all the vertical
    rails as well, so everything had to come out and be rebuilt. It is fun doing it while
    the everyone is at work as well, you have to plan the build so you only have one shutdown
    during the lunch break! It all ended up working out nicely in the end, everything
    is on rails and is easily accessible.

    My suggestions for anyone looking to build/rebuild a rack are:

    • Allocate twice as much time as you think you will need

    • Pull as much out as you can

    • Don’t start running cables until you have as much equipment in as possible

    • Get a bag of zip ties

    • Plan everything beforehand

    • Get as many decent screwdrivers and spanners as you can

    It is worth it in the end. We now have better air flow, if there is water in the room
    the servers will be fine, better accessibility (important especially in emergency
    hardware failures) and better physical security.